• DeKalb
    10°
    DeKalb, Illinois
  • Tuesday 01:48 AM
    12th of November, 2019
    - or - 815.758.3513

    KWRD Phase 1B Improvements - Current Project Information

    The District's $46.35m project is currently under construction.

    Details of the ongoing project can be viewed by clicking below

    Phase 1B
    Improvements

    KWRD-Malta & Kishwaukee College Sanitary Service Extension

    The IEPA Notice of Intent to issue a Categorical Exclusion

    is available below. Please click the button below.

    Notice of Intent to issue a Categorical Exclusion

    Advertisement for Bids

    2019 Spot Repair Improvements currently out to bid. Bidding ends at 11:00 AM on Tuesday, September 3rd, 2019.





    Ad for Bid

    Biosolids (Sludge) Management

    Throughout the treatment process, solids have been drawn off and separated from the wastewater. The Kishwaukee Water Reclamation District is a Class One sludge management facility, monitored by the United States Environmental Protection Agency to ensure that biosolids leaving the plant are safe and are put to appropriate uses.

    Anaerobic Digesters

    Biosolids Purification: Primary Anaerobic Digesters

    All sludges from each of the sedimentation tanks combine with the raw sludges from the primary clarifiers and are pumped to primary digesters for sludge stabilization and dewatering. There they are heated and undergo an anaerobic-mesophylic digestion process. Pathogens and materials that attract insects are removed. Anaerobic bacteria digest the sludges into methane gas and water.

    Biosolids Purification: Secondary Anaerobic Digesters

    From the primary anaerobic digesters, the sludge is moved to the secondary anaerobic digesters. There the sludge is stabilized further, and as its pH rises, methane is produced and water is removed. The resulting biosolids contain nutrients and organic humus.

    Disposal of Digested Biosolids

    The Biosolids Rehabilitation Project, completed in 2012, rehabilitated four very old digesters which are responsible for anaerobically digesting the solids that remain after the treatment process has cleansed the water. A new digester operations building houses equipment to run these digesters. This project was completed by Williams Brothers Construction, Inc. of Peoria, Illinois who was the lowest of nine bidders at the July 31, 2009 bid opening with a bid of $18,640,000.00. Funds for this project came from a federal stimulus loan (American Recovery & Reinvestment Act of 2009) and an IEPA low interest loan.

    Although the anaerobic digestion process reduces the bulk of the solids, the digesters eventually fill up with biosolids in a watery slurry. In the past, the District has paid a contractor to have this liquid removed by truck and taken to farm fields where it is spread as fertilizer. However, sometimes fields were not accessible or roads were posted when the digesters needed to be emptied. Since the digesters cannot be allowed to overflow, contractors would be found to bring in portable de-watering equipment on an emergency basis.

    Now, equipment has been installed with which the District can de-water its own biosolids. Being able to do this on site is more cost efficient, and allows better control of the sludge digestion process. After dewatering, the biosolids take up much less volume and resemble loam, being odorless except for an earthy smell. A building on the District’s property South of I-88 and east of South First Street holds biosolids until they can be hauled away by a contractor to be spread on farm fields.

    Contact Us