KWRD Phase 1B Improvements

The District's $46.35m project is currently under construction.

Details of the ongoing project can be viewed by clicking below

Ph 1B Improvements

Fiscal Year 2019/2020 Tentative Budget

The FY 2019/2020 Tentative Budget is available

for review. Please click the button below

FY 2019/2020 Tentative Budget

Preliminary Mechanical Treatment

Preliminary Treatment is aimed at removing large objects, coarse debris and inorganic material from the wastewater.

Removal of Inorganic Material

Bar Screens

Large objects like clothing, soda cans, beer bottles, rags, sticks, feminine hygiene products, diapers, tree roots, large clumps of grease – all the things not meant to be flushed in the first place – are taken out of the wastewater by passing it through openings in parallel bars in machines called “bar screens.”

The wastewater passes through openings in parallel bars while the debris (called screenings) gets caught on the bars and is removed by means of a mechanically operated rake that pushes the screenings onto a trough.

Compacting and Disposal of Screenings

The screenings generated from the preliminary treatment are pressed to remove excess water and then bagged into a plastic tube. They are then put in a dumpster to be hauled off to a sanitary landfill for burial.

Grit Removal

Next, the wastewater is put into a velocity controlled tank called a cyclone dewatering unit. A vortex mixer controls the velocity in the tank so that only the heavier particles settle out, removing glass, metal, sand and gravel particles, referred to as “grit.”

Disposal of Grit

The grit is then conveyed up an incline and placed in a dumpster for disposal in the sanitary landfill.

Continuation of the Treatment Process

The lighter organic materials remain in the wastewater and move on to the next stage of treatment. Pumps move the wastewater, now strained of trash, sand, and gravel, on to Primary Treatment.